CASE STUDY
COBURG ASSEMBLE
Coburg Assemble is a twin-tower build-to-rent development for Kapitol Group, splitting above Level 3 into separate 16 and 15 storey buildings. Floor plates run around 1,300m² each, with the full structure completed start to finish in ten months.
PCF built the structure using two hydraulic jumpforms, with a full scaffold edge wrap providing fall protection in place of perimeter screens. Wrapping the perimeter in scaffold suited the building’s split form and kept crews protected through every pour cycle.
Value$33mClientKapitol GroupSectorBuild to RentLocationCoburg, VICCompletion dateJune 2026Sqm41,564m²
41,564m²
Concrete Placed
Concrete placed across the twin towers in ten months.
10,468m³
Concrete Volume
Total volume poured from ground to roof.
1,924
Precast Panels
Precast panels installed through the structure.