Coburg Assemble is a twin-tower build-to-rent development for Kapitol Group, splitting above Level 3 into separate 16 and 15 storey buildings. Floor plates run around 1,300m² each, with the full structure completed start to finish in ten months.

PCF built the structure using two hydraulic jumpforms, with a full scaffold edge wrap providing fall protection in place of perimeter screens. Wrapping the perimeter in scaffold suited the building’s split form and kept crews protected through every pour cycle.

Value$33mClientKapitol GroupSectorBuild to RentLocationCoburg, VICCompletion dateJune 2026Sqm41,564m²

BUILD TO RENTCOBURG

41,564m²

Concrete Placed

Concrete placed across the twin towers in ten months.

10,468m³

Concrete Volume

Total volume poured from ground to roof.

1,924

Precast Panels

Precast panels installed through the structure.