CASE STUDY
WILLIAM ANGLISS HOSPITAL
Delivered for KANE Constructions, the William Angliss Hospital project saw PCF build within a live, operating hospital. More than 11,000m² of concrete was placed over a four-month program, with the surrounding wards and departments running throughout.
Working inside an occupied health facility put noise control and coordination at the centre of the job. Close collaboration with KANE and the hospital allowed PCF to sequence the works around clinical operations and hand the structure back on program.
11,231m²
Concrete Placed
Concrete placed within a live, operating hospital.
4,320m³
Concrete Volume
Total volume poured over a four-month program.
176
Precast Panels
Precast panels installed on site.